您的当前位置是:Home > Facilities > Main Facilities
Main Facilities

1.       Main Facilities 

GWS has one slipway of 25000DWT, two dry docks of 70000DWT and 25000DWT, equipped with two cranes of 400 tons and 200tons, and one crane of 100 tons. It owns six numerical control cutting machines, heat-treatment shop and other kinds of shops, facilities and equipments.

Equipment name
L x W x H
DWT
Crane
Slipway
190 x 28
25000
100t x 2 sets
No.1 Dock
240 x 36 x 9.5
70000
400t x 1 set   36t x 2 sets
No.2 Dock
237 x 28 x 11.2
25000
200t x 1 set    40t x 1 set
10t x 2 sets    15t x 1 set
No.1 Quay
Length 152m
 
30t x 1 set     25t x 1 set
15t x 1 set
No.2 Quay
Length 200m
 
25t x 1 set
No.3 Quay
Length 110m
 
10t x 1 set     36t x 1 set

 
2.       Facilities Diagram
 
No.1 Dock                               No.2 Dock
Slipway                                 Quay
Section Bar Preprocessing Line               Numerical control cutting machine
 
Website Form | Privacy Statement | Copyright and Privac | Advisory Complaints | Contracts
Visit Quantities:4134696

Guangzhou Wenchong Shipyard Co.,LTD Copy Right
Address: No.1 Wenchuan Road, Hongshan Street, Huang Pu, Guangzhou Postcode: 510727
Tel: 020-82389933 Fax:020-82381339
Maintenance Unit : China State Shipbuilding Corporation Information Technology Center Address: No.5 Yue Tan North Street, Western City District, Beijing
TEL:08610-59518822 Fax:+8610-59517959 Email:clients@shipbuildingec.com.cn
备案号:粤ICP备 07076892号